Relay and Substation Test System

Megger-SVERKER-900 LR02 July 2014 - Megger introduces the SVERKER 900 as the engineer’s ultimate toolbox that addresses the increasing need for three-phase testing capability in electrical distribution substations, renewable power generation stations and industrial applications. The intuitive user interface is presented on the LCD touch screen. It has a powerful combination of current and voltage sources and a versatility of measurement possibilities.

The toolbox for substation 3-phase testing features:

  • Three currents and four voltages
  • Stand-alone functionality
  • Rugged and reliable for field use
  • Generation of 900 V and 105 A in single phase mode
  • Secondary and primary testing

The SVERKER 900 is specifically designed for basic, manual threephase secondary testing of protection devices. In addition, various primary testing can be performed, since the current and voltage sources can be series- and/or parallel connected to allow for up to 105 A AC or 900 V AC output.

www.megger.com/



Related Articles:

No related articles found


Upcoming Events

Embedded World 2024
Nuremberg (Germany)
09 to 11 April
Control 2024
Stuttgart (Germany)
23 to 26 April
Automotive Testing Expo Europe 2024
Stuttgart (Germany)
04 to 06 June

  More events...
  See our Trade Show Calendar
  Click here